PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling and compacting along foundation walls at column line 6.5 (G-D) Facing East (800x600).jpg Finished closing metal decking at Derrick -1 (2nd Floor) Facing South (800x600).jpg Installing underground storm sewer Facing North (800x600).jpg Conduit for the temporary power Facing South-West (800x600).jpg Installing metal decking at Derrick -3 (2nd Floor) Facing South-West (800x600).jpg
Next page Backfilling and compacting along foundation walls at column line 6.5 (G-D) Facing East (800x600)
Backfilling and compacting along foundation walls at column line 6.5 (G-D) Facing East (800x600)